Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online today at 14:56

Candidate

Male, 38 years, born on 22 February 1987

Considers offers

Aktau, willing to relocate (Azerbaijan, Aksay (Kazakhstan), Aktobe, Alga (Aktyubinsk Oblast), Almaty, Aralsk, Astana, Atyrau, Other regions, Zhanaozen, Karaganda, Russia, Ukraine, Uralsk), prepared for business trips

Drilling and Workover engineer

1 000 000  in hand

Specializations:
  • Other

Employment: full time, part time, project work, volunteering, work placement

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 16 years 4 months

January 2023currently
2 years 3 months
KMG Engineering
Lead Drilling and WO engineer.
Preparing project and maintenance drilling and WO operations. Well depth 1000m to 4000 m.
November 2021November 2022
1 year 1 month
«Tasbulat Oil Corporation» LLP

Aktau, pk.uchet.kz/c/bin/060840001641/

Drilling and WO engineer.
Drilling and workover operations at the Tasbulat, Aktas, Turkmenoy, Komsomolsk fields.
November 2018November 2021
3 years 1 month
"EMIR-OIL" LLP
Drilling, Workover and Coiled Tubing Engineer.
Job responsibilities: • Preparation of a drilling program for drilling exploratory and production wells with depths 4150 meters in the water protection area. Where there are aquifers that feed the city with process water. • Preparation of Job program, an Order-Outfit for the operation of current and capital repairs of wells and for working with coiled tubing unit (flexible tubing). Types of work: Replace and installing ESP, well preparation for well testing, bottom hole cleaning, repair and isolation works, well preparation for coiled tubing, acid jobs (treatment well), perforation jobs, nitrogen-compressor work, RIH of the tubing well with gas-lift valve, emergency and fishing operations for Workover. • Monitoring the implementation of plans for drilling, WO and maintenance of wells and work with coiled tubing. Checking the productive and non-productive time of the machines of WO and the preparation of Vouchers for payment on the work done. • Creating the conditions for workers to fulfill production plans, promoting the introduction of new equipment and technology in the oilfield. • Preparation of technical specifications for a tender for Workover, drilling wells, coiled tubing, for the purchase of equipment and service organizations for servicing wells. As well as a technical assessment of the tender participants. • Monitoring and taking measures to reduce Workover non-productive time. • Monitoring the implementation of applications for the repair and manufacture of equipment, tools and devices. • Development of measures to identify production reserves. • Monitoring compliance with the workers of the workshop production and labor discipline, the rules of the internal labor schedule. • Taking part in the work of the standing commission on labor safety. • Checking the conditions of working conditions in areas, monitoring compliance with technological regulations and instructions when conducting production processes at oilfield. • Organization of training and testing of knowledge of technological regulations with staff. Ensuring labor and production discipline in the team. • Ensuring the proper organization and safe work, the operation of machinery, equipment, appliances, tools and protective equipment and their maintenance in good condition. • Fulfillment of the planned measures to ensure industrial safety and work in accordance with the geological and technical measures (geologist technological measures) on time. • Supervision of the work of the Workover, coiled tubing at the fields of "EMIR-OIL" LLP contract areas (oilfields): Kariman, Aksaz, Esen, Begesh, Aiday, Dolinnoye, Borly, Emir. All fields are being developed at the Triassic horizons, terrigenous and carbonate deposits with a well depth of 4150 meters.
December 2012August 2019
6 years 9 months
“Buzachi Operating” Ltd

Aktau, info@buzachi.kz

Oil and Gas... Show more

Drilling Supervisor
Job responsibilities: • Control all the drilling operation from spud in to completion well. • Decide and control problems, emergency situation while drilling for example: mud loss, stuck BHA and pipe, blow out fluids from well, settle cement plug. • Control all the mud parameters while drilling and drilling parameters. • Keep and control all drilling parameters in accord contracts obligation and government rule. • Control of HES, and environmental while drilling operations, recognition and identification of pre-emergency situation. Labor protection and improving performance of drilling. • Control and regulation of drilling fluid properties, the identification of the causes of change in the properties of the drilling mud. The use of different types of mud: lightweight drilling fluids with MW-0.85 gr/cm3. • Control of skin factor of the production intervals. • Recommendations for drilling fluids, their properties and treatment facilities, and the whole drilling technology. • Quality control of cementing, identifying the causes of poor cementing. • The full management operations with liner partially cementing intervals: Check out open hole, replace old mud to solids free mud. RIH liner with screens on drill pipes, landing hanger on slips, activation of the formation paker, opening windows of the collar, circulation, perform cementing the liner, settle plug, activation inside casing liner hanger and anchor, disconnection of the liner, Circulation and wash out excess cement, POOH DP's.
December 2009December 2012
3 years 1 month
“Buzachi Operating” Ltd

Buzachi.kz

Oil and Gas... Show more

Drilling Engineer assistant
Coordinate of warehouse job for drilling. Prepare of DDR’S, equipment report, RFM. Monthly report about drilling activity. Assist to drilling supervisors. Watching to settles conductors and cellars.
September 2008September 2009
1 year 1 month
LLP “Oil Service Company” contractor of “MangystauMunaiGas”

MMG.KZ

Oil and Gas... Show more

Roustabout, Floor man, Derrick man, Driller assistant, Junior tool pusher in a rig for exploration vertical wells (on-shore).
Vertical well, project deeps 3960 meter. Rig type: Uralmash-3D. Job title: Roustabout, Floor man, Derrick man, Driller assistant, Junior tool pusher in a rig for exploration vertical wells (on-shore). Job responsibilities: To prepare daily drilling reports and any technical documentation related to drilling To verify mud properties while drilling

Skills

Skill proficiency levels
MS Project Expert
Поиск информации в интернет
Деловое общение
Делопроизводство
Driving Licence B
Adobe Photoshop
Заключение договоров
Навыки презентации
Подбор персонала
Подготовка презентаций
Английский язык
Пользователь ПК
Работа в команде
Ведение переговоров
Грамотная речь
Деловая переписка
Управление персоналом
MS Outlook
Обучение персонала
Водительское удостоверение категории B
MS PowerPoint
Финансовый анализ

Driving experience

Driver's license category B, C

About me

Ability to improve skills on the job and quickly acquire new areas of activities, adaptation to any tempo and mode. Teamwork skills, creative approach to work, mobility, commitment, willingness to work for make benefit to maintain and strengthen the company's image.

Higher education (bachelor)

2008
Caspian Social University (Almaty – Kazakhstan)
Oil and gas, Oil & Gas business

Languages

KazakhNative


EnglishC1 — Advanced


RussianC2 — Proficiency


Professional development, courses

2014
Skills writing business letters
“Ambition”, Kazakhstan, city Aktau, Training center
2014
Well control, Blow out control, oil and gas of well while drilling.
Committee for State Control of Emergency Situations and Industrial Safety of Kazahstan. Training place: Kazakhstan, Atyrau., Central paramilitary headquarters of the professional emergency services of Kazahstan.
2014
Drilling and cementing of oil and gas wells
Institute of Petroleum Engineering & Information Technologies of KBTU. Training place: Kazakhstan, city Almaty., Kazakh Britich Technical University
2013
Modern drilling system at the control pressure. Multilateral wells. Optimizing recovery enhancement
“Inteconference”, England, city London., Training center
2012
Drilling mud
“NURIKON”, Kazakhstan, city Almaty., Training center
2011
Certificate of international association of drilling contractors Well control “Well CAP”
“Petrofac Training Services”. Training place: Baku, Azerbaijan, Drilling Supervisor. Stack Qualification: Surface Only (SO)

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan, Russia

Desired travel time to work: Doesn't matter